| Building envelope grant | 15 % of eligible expenses |
BEG EM funding guideline, no. 8.4.1 letter a
|
in force since 21 July 2026 |
| Cost limit per residential unit and calendar year | €30,000 (1st unit), €15,000 each (2nd to 6th unit), €8,000 each from the 7th unit; with iSFP €60,000 / 30,000 / 15,000 |
BEG EM funding guideline, no. 8.3.1 letter a
|
in force since 21 July 2026 |
| iSFP bonus | +5 percentage points, only on the share of costs above the base limit; minimum investment €30,000 gross; iSFP must be available when applying |
BEG EM funding guideline, no. 8.4.2
|
in force since 21 July 2026 (previously the bonus applied to all costs) |
| Minimum investment | €300 gross per individual measure |
BEG EM funding guideline, no. 4
|
in force since 21 July 2026 |
| Windows, balcony and patio doors | Uw of at most 0.95 W/(m²K); with special glazing (sound, fire) or burglar-resistant 1.1 |
BEG EM, annex technical minimum requirements, no. 1.1
|
in force since 21 July 2026 |
| Roof windows, exterior doors | Uw of at most 1.0 W/(m²K); exterior doors of heated rooms UD of at most 1.3 W/(m²K) |
BEG EM, annex technical minimum requirements, no. 1.1
|
in force since 21 July 2026 |
| External sun protection | Eligible as summer heat protection, parallel to the glazing on the building envelope (DIN 4108-2, table 7 rows 3.1 to 3.3). Awnings, canopies and freestanding louvres are excluded. |
BEG EM, no. 5.1 letter c and annex no. 1.2.2
|
in force since 21 July 2026 |
| Application before project start | Application before the project starts; when applying, a supply or service contract with a condition subsequent or condition precedent tied to the funding commitment must be available |
BEG EM funding guideline, no. 9.2.1
|
in force since 21 July 2026 |
| Energy efficiency expert | An energy efficiency expert must be involved for building envelope measures and for the iSFP bonus |
BEG EM funding guideline, no. 9.3
|
in force since 21 July 2026 |
| Approval period and proof | 36 months from receipt of the notice; proof of use within six months of completing the project; payout after review |
BEG EM funding guideline, no. 9.4.1 and 9.5.1
|
in force since 21 July 2026 |
| No double claim with tax reduction | No accumulation with § 35a or § 35c EStG for the same measure |
BEG EM funding guideline, no. 8.6
|
in force since 21 July 2026 |
| KfW supplementary loan 358/359 | Up to €120,000 per residential unit, up to 100 % of eligible costs; only in addition to a BAFA or KfW grant commitment already issued (not older than 12 months). 358 for owner-occupiers with household income up to €90,000. |
KfW loan fact sheet 358/359
|
dated 09/2026, valid from 24 September 2026 |
| KfW 455-B barrier reduction (grant) | 10 % of costs up to €25,000 per residential unit. New applications were most recently no longer possible because the funds were exhausted. Windows and French doors are not funded here, only under the BEG. |
KfW fact sheet 455-B (as of 04/2026); funding status according to trade press (energie-fachberater.de), not confirmed by kfw.de
Trade press |
fact sheet 04/2026; funding status end of July 2026 |
| KfW 455-E burglary protection (grant) | According to trade press, without budget funds since the end of 2023, no resumption announced. Not confirmed by kfw.de: check there before any planning. |
Trade press (including lupus-electronics.de); KfW page was not accessible
Trade press |
retrieved 1 October 2026 |
| KfW 159 age-appropriate conversion (loan) | Low-interest loan, also for burglary protection and barrier reduction. Please check terms and maximum amount directly with KfW. |
Trade press; programme at kfw.de
Trade press |
not conclusively verified |
| § 35a EStG tradesperson services | 20 % of labour costs, tax reduction of at most €1,200 per year; labour costs only, invoice and non-cash payment |
§ 35a para. 3 Income Tax Act (Einkommensteuergesetz)
|
retrieved 1 October 2026 |
| § 35c EStG energy-efficient renovation | 7 % + 7 % + 6 % of the expenses over three years, at most €40,000 per property; owner-occupied residential building, older than ten years, certificate from the specialist contractor |
§ 35c Income Tax Act (Einkommensteuergesetz)
|
retrieved 1 October 2026 |